Small Housing Development, Plots 1-7
Much Hoole, Preston
3 different house types.
SAP Calculations
Compliance achieved through:
Good building fabric ie Cavity Walls - 125mm Knauf Dritherm Cavity 32 Slab with a low density inner block.
Worcester combination boilers and some small WWHR systems.
Client - Lemming Associates
Two 4 Bedroom Homes
Awelfryn, Amlwch
SAP Calculations carried out to meet Part L1A of the Building Regulation.
Timber frame construction with 90mm Celotex (unbridged) in the external walls.
Windows and doors U Value 1.4
log burner.
Water Calculations also provided.
Client - Wellbuilt Construction Ltd
Extension to Detached House
Westhoughton, Bolton
23 m2 Single Storey Kitchen Extension
Two assessments were carried out, both a Notional and a Proposed to show compliance with Part L1B of the Building Regulations. The existing house having some improvements and alterations carried out which further reduced the CO2 emission rate.
B&M Store
Inshes Retail Park, Milton of Inshes, Inverness
2000m2 Single Storey Retail Park building
Fit-Out project.
SBEM Calculations carried out for the fit out stage.
Client - B&M Retail Ltd
Dunton Environmental Building
Northgate, Walsall
1100m2 Office Building
SBEM Calculations and Predicted EPCs carried out which included multiple sets of output documentation, the main variable being insulation levels.
Former Bullocks Building - Refurbishment project.
Client - Dunton Environmental
Alvechurch Care Home
West Heath, Birmingham
4000m2 Building
SBEM Calculations carried out and EPC provided for a new build 4 storey care home.
Compliance to Part L2A has been achieved through the following:
Boiler system 3 x Vaillant EcoTEC 100s
LED lighting design - modified/improve
Air permeability - 3.68 m3/hr-m2
Client - Paul Ravenhall Consultants
Broomfield Park Medical Centre
Spon End, Coventry
420m2 Extension
As designed SBEM Calculations carried out
Compliance achieved through:
Good building fabric
Gas combination boiler with cylinder
Well distributed LED lighting design
Client - Broomfield Park Medical Centre
Child Development Centre
Grovelands Day Hospital, Chadwell Heath, London
440m2 Extension NHS
SBEM Calculations
A project coming under Part L2A for new buildings because of existing criteria for extensions.
HVAC specifications and LED lighting ensured compliance.
Units 1-4 Retail Park
Kirkcaldy, Fife
476m2 Single Storey Retail Park building
Shell and Fit-Out project.
SBEM Calculations carried out for the Shell Stage.
Future calculations and 'On Construction' EPC's will be required by prospective tenants for their specific Fit-out warrants as per Section 6 directives.
Units A-H Goodhill Trading Estate
Ilkeston, Derbyshire
Industrial Development
SBEM Calculations including
Compliance advice on HVAC installations
Monckton Road, Industrial Estate
Wakefield, Leeds, Yorkshire
380m2 Light Industrial Development
SBEM Calculations carried out for two new industrial units
Shell and Core project.
Client - David Garner Design Associates
Brighstone C of E School
Newport, Isle of Wight
180m2 Single Storey Classroom Block
Timber Frame construction with underfloor heating.
SBEM Calculations carried out to satisfy building control.